We took part in the 60 km high-voltage power transmission line project on the Bandırma – Gemlik route within the scope of TEİAŞ.
One of the activities we carried out within the last five years.
High-voltage power transmission line works over 60 km between Bandırma and Gemlik.
We took part in the 60 km high-voltage power transmission line project on the Bandırma – Gemlik route within the scope of TEİAŞ.
One of the activities we carried out within the last five years.